Identify and mitigate risks early and avoid cost overruns
Reduce risk
Verify site assessments from your clients and subs
Increase accuracy
Create fast, accurate bids with automated site evaluations
Better engagement
Engage clients earlier with site feasibility guidance
Evaluate sites in minutes, not weeks
Generate comprehensive site assessment reports from your desktop to pinpoint potential construction bottlenecks.
Learn more about Transect Reports
Learn more about Transect Reports
Confirm the buildable area of a project
Assess topography, waters, species, mandated setbacks, soils, protected areas and other factors that affect buildability.
Stay on top of environmental permits
Get a detailed inventory of federal, state and local environmental permits required to complete any project.
Support for linear projects
Identify milepost locations of environmental features of concern along proposed pipeline and transmission line routes.
Industry insights
Report
2026 EPC Survey Report
Explore how EPC teams are managing project evaluation and environmental reviews in an increasingly complex landscape.
Download
Report
2026 Renewable Energy Developer Report
Renewable energy developers share their top concerns and forecasts about the year ahead.
Blog
The Top 5 Challenges EPC Firms Face
EPC firms are vital to large-scale projects. Discover their top challenges and how to overcome them.
Checklist
Environmental Permitting Checklist
Learn the key steps to assess project sites thoroughly.